
Newly built trail. After the leaves fall next autumn this
will look more natural. |

The US Forest Service specs for this section of trail are: full
bench-cut, 30" tread, 10% maximum grade. |

The steep hillside required a lot of digging-- the backslope is
almost to Carl's waist. |
This portion was all hand cut. Crew 4 did a great job
with this. |

A lot of dirt was moved this weekend. |

Mike, Bela, Scottie and others work on a switchback. |

Rocks provide an obstacle to prevent short-cutting. |

Scottie tamps down dirt above a small rock retaining wall. |

The switchback is almost complete. |
That's the end of our galleries! Click
here to go to main photo page. |