HOME TRAIL MAPS PLANNER SHUTTLE FORUM CONTACT
 
 
 

Work Party - January 26th, 2003

It was 15 degrees on a SuperBowl Sunday, yet 10 dedicated souls showed up to build trail!  (click on an image for a full-size view; 100KB-140KB each)


The crew with the SWECO in the background

Warming by the fire in the power line easement

Lunchtime!

Three Amigos. This was Chris' first outing (middle)

Before....

After!

This is what the trail looks like after the SWECO dozer cuts away a base tread (saving MUCH work)

There is a bit of work to do before this becomes a finished trail

First, Russ takes a pulaski to cut a good upslope

Next, we pull off all the sluff the dozer left for us

Next we create a flat tread

Chris packs down some soil into a loose hole

Nice upslope!  Our tread is about a pulaski-length in width (30"-36")

Finished trail!  Take a look at the first picture for comparison.

A closer look.  The trail has a gentle slope for water run-off, and the downslope is drawn away and clean.  In a year, vegetation and leaves will make this trail look great.  (Note: we still have to cut the tree stump at ground level)

Another portion of the trail, gently winding along the contour of the hill

John is tired but happy after another fine day on the trail
Great work, folks!  Many thanks to Chris, Russ, Amanda, Jeff, Robert, John, Paul and the Gavin Family!

 


 

Copyright © 2008, Ozark Trail Association. All rights reserved.